A bit of a break over Christmas and back into it, gearbox crossmember done and master cylinders mounted up. We are going to need to make new pedals to move them to the right to allow heel toe gear changes. Until I get down to the shop to sit in the car and measure them up that's as far as we can go there. There's still plenty to do - Fuel tank, dry sump mounting, make new dry sump pan for the engine and sorting total engine height and bonnet clearance (or lack thereof).